Capt. Kirk
Veteran Member
- Joined
- Jun 9, 2020
- Messages
- 56
- Location
- United States
- Vessel Name
- "At Last" and "Coquina Cat"
- Vessel Make
- 48’ Offshore Yachtfish and 27' Glacier Bay
I have an accepted off on a RPHMY with twin 550 HP DD 6V92s.
With 550 HP, am I correct that they must be TAs?
The current owner has had her for five years. He says he has run her at 8 to 10 knots, occasionally 20 knots.
Of course, I don’t know the entire history of usage, so I plan to hire an experienced Detroit engine surveyor, if I can get one – it seems there are only two on the Chesapeake and one doesn’t return phone calls.
I will ask the engine surveyor to not pull any punches, submit an oil sample, and review the rebuild documentation from the owner.
I have one quote for a “basic survey” of $1800 to $2200 for a full day, including travel. Is that a fair amount?
I asked about having them take a deeper dive and they said they could remove the valve covers and do a bore scope. They said that would be a second day at the same rate
Should I plan to do this? Is it needed? Should I plan it in advance or wait until they’ve done the first day, “basic survey” first?
Is there anything else I can or should do?
With 550 HP, am I correct that they must be TAs?
The current owner has had her for five years. He says he has run her at 8 to 10 knots, occasionally 20 knots.
Of course, I don’t know the entire history of usage, so I plan to hire an experienced Detroit engine surveyor, if I can get one – it seems there are only two on the Chesapeake and one doesn’t return phone calls.
I will ask the engine surveyor to not pull any punches, submit an oil sample, and review the rebuild documentation from the owner.
I have one quote for a “basic survey” of $1800 to $2200 for a full day, including travel. Is that a fair amount?
I asked about having them take a deeper dive and they said they could remove the valve covers and do a bore scope. They said that would be a second day at the same rate
Should I plan to do this? Is it needed? Should I plan it in advance or wait until they’ve done the first day, “basic survey” first?
Is there anything else I can or should do?