When we bought our trawler I knew what I want to do with solar system onboard.
We living full time onboard and not at dock.
On previous boat we all ready had solar panel.
My plan for Super MAN was 18 panel of 330watt and I bought 2 years ago when we bought the boat, to much job on the stainless steel man not available to make this "T top" to received all panel so I decided to installed on original "T top"
was light T top so we fit (only) 10 panels.
Since 2 years was ok with this installation but one year ago we get 40/45kt of wind and was limit to lose panel.
for the last hurricane (Maria) I was in St Lucia and weather report was incertain so I decided to toke out the 10 panel.
Back to ST Barth (home port) I catch my stainless steel guy to tell him this is time to make this "T top"
I'm super happy after 2 years we start this project.
yesterday we lift the T top to present to take dimension for leg, after we going to bring down to finish all before to install definitively and start to put all panel on it.
Nice Capitainerie authorize us to build under their facility because we low season, thank to them
starting to assembling
and more pipe
lifting be hands to prepare to gift by hydraulic
We living full time onboard and not at dock.
On previous boat we all ready had solar panel.
My plan for Super MAN was 18 panel of 330watt and I bought 2 years ago when we bought the boat, to much job on the stainless steel man not available to make this "T top" to received all panel so I decided to installed on original "T top"
was light T top so we fit (only) 10 panels.
Since 2 years was ok with this installation but one year ago we get 40/45kt of wind and was limit to lose panel.
for the last hurricane (Maria) I was in St Lucia and weather report was incertain so I decided to toke out the 10 panel.
Back to ST Barth (home port) I catch my stainless steel guy to tell him this is time to make this "T top"
I'm super happy after 2 years we start this project.
yesterday we lift the T top to present to take dimension for leg, after we going to bring down to finish all before to install definitively and start to put all panel on it.
Nice Capitainerie authorize us to build under their facility because we low season, thank to them
starting to assembling
and more pipe
lifting be hands to prepare to gift by hydraulic