Tonic1
Senior Member
- Joined
- Mar 21, 2018
- Messages
- 155
- Location
- US
- Vessel Name
- Tonic
- Vessel Make
- 2007 Mainship Pilot Sedan 34
The Indiantown RR bridge on the OWW will be on a very reduced schedule over the next couple months. This schedule begins next week, with openings only on Tuesday, Thursday, and Saturday at 11am. Then normal schedule for the following 2 weeks, then repeat the cycle. Work finishes up mid July. Of course our planned transit is for next Wednesday
Details can be found on the Waterway Guide at
https://www.waterwayguide.com/nav-a...erway-mile-282-seaboard-rr-bridge-maintenance
Details can be found on the Waterway Guide at
https://www.waterwayguide.com/nav-a...erway-mile-282-seaboard-rr-bridge-maintenance