Well, its time for another tank replacement thread. I know we have done this many times, because I have spent hours reading the TF threads during my pre-job research. The tank has had about a 4 oz a week leak for about a year. It was very manageable but I want it fixed before it is not manageable and things go really bad. The tank is 175 gal, 62"X27"X31 shaped like the hull.
We spent the first day removing the holding tank, removing interferences and pumping the fuel over to the port tank. The hold tank hose removal was a little gaggy. Today we removed some of the soundproof enclosure and cut a hole in the forward wall to see what we a dealing with inside. Using Diablo carbide tipped Sawzall blade and I am impressed so far. The steel is slightly less than 1/8" thick.
The tank will be replace with two aluminium 31"X 27"X29" tanks piped together with 1 1/2" hose. Wish me luck. I will try to keep up with the pictures.
BTW, the sludge next to the fuel return pipe is 1/2" deep.
We spent the first day removing the holding tank, removing interferences and pumping the fuel over to the port tank. The hold tank hose removal was a little gaggy. Today we removed some of the soundproof enclosure and cut a hole in the forward wall to see what we a dealing with inside. Using Diablo carbide tipped Sawzall blade and I am impressed so far. The steel is slightly less than 1/8" thick.
The tank will be replace with two aluminium 31"X 27"X29" tanks piped together with 1 1/2" hose. Wish me luck. I will try to keep up with the pictures.
BTW, the sludge next to the fuel return pipe is 1/2" deep.