I'm starting this thread to track and possibly commiserate and solicit ideas as I prepare for my second season with my old Mainship 34.
Consider this to be my disclaimer: I'm not doing anything novel or grand, it is really just mundane maintenance and repairs but in the past I've enjoyed reading and discussing other's similar projects and sharing my own. I've benefited from others' lessons learned and perhaps I'll have some information worth sharing about how I go about a repair or sourced parts from.
Last year, I hauled the boat for about 3.5 weeks to address the higher priority findings from the survey, (the yard that short hauled for the survey didn't have room at the time for me to at the time of closing). Now I'm working on the next level of priorities and other items that have come to my attention over the past year. I hauled the boat in October, winterized and shrink wrapped it but it has been too cold or I have been too lazy to make much progress since.
1. Replace thru-hulls above the waterline, they are a mix of plastic and marelon and I'm replacing them all with bronze. This was on the survey and I only replaced one last year that was right at the waterline. This will take care of the remaining 8.
2. Replace sink drain fitting in the head, this fell apart when removing the line for project #1. Minor issue but listing is separate so I can cross something off.
3. Re-bed swim platform supports. There are 4 cast brackets the secure braces for the swim platform to the bottom of the transom, the caulking is probably original on all.
4. Replace swim platform braces, the stainless tubing for each 4 support is damaged from lack of cathodic protection.
5. Install new 12V panel and migrate wiring to new panel. I just don't care for the existing fused switches at the lower helm, it is a bit of a rat's nest of wiring behind the helm and I want to move most everything to a breaker panel.
6. Complete fabrication of anchor platform and install with new windlass. I started this project during my haul last year and just didn't finish. Retrieving the anchor by hand really isn't bad but I need to get this project done.
7. Repair starboard gunnel. 3 foot section of spider cracking of gelcoat inside of rub rail. A previous owner smacked a piling hard amidships, this will require substrate repair of the fiberglass and gelcoat work. Looking forward to getting this done.
8. Straighten Stanchion, the forward port stanchion was bent upon purchase, I need to straighten or replace.
9. Replace life lines, the vinyl covered life lines are rust stained, the cable is compromised and a safety hazard. The replacements won't have the coving to trap in moisture. I should have addressed this sooner.
10. Repair cockpit core, there are two distinct soft spots in the cockpit, one at the base of the latter, one behind the sliding door to the saloon (salon?).
11. Kiwi grip cockpit and flybridge deck. After repairing the cockpit, this will clean up the appearance of both areas.
12. Install autopilot. This can wait until the boat is back in the water but this is a nice to have - borderline fun project that will be a break from the repairs. I'm doing this in conjunction with adding a MFD to the lower station which can control the AP as well.
13. Replace center support bearing, I don't know if it is back or not but it is probably due, I have the new one on hand but need to have the prop pulled or to borrow a prop puller to knock this out.
14. Replace exhaust manifold?, haven't made a decision on this one yet but I don't see any records of it being done before and it is probably due.
No big deal right? Hoping to launch by end of April.
Consider this to be my disclaimer: I'm not doing anything novel or grand, it is really just mundane maintenance and repairs but in the past I've enjoyed reading and discussing other's similar projects and sharing my own. I've benefited from others' lessons learned and perhaps I'll have some information worth sharing about how I go about a repair or sourced parts from.
Last year, I hauled the boat for about 3.5 weeks to address the higher priority findings from the survey, (the yard that short hauled for the survey didn't have room at the time for me to at the time of closing). Now I'm working on the next level of priorities and other items that have come to my attention over the past year. I hauled the boat in October, winterized and shrink wrapped it but it has been too cold or I have been too lazy to make much progress since.
1. Replace thru-hulls above the waterline, they are a mix of plastic and marelon and I'm replacing them all with bronze. This was on the survey and I only replaced one last year that was right at the waterline. This will take care of the remaining 8.
2. Replace sink drain fitting in the head, this fell apart when removing the line for project #1. Minor issue but listing is separate so I can cross something off.
3. Re-bed swim platform supports. There are 4 cast brackets the secure braces for the swim platform to the bottom of the transom, the caulking is probably original on all.
4. Replace swim platform braces, the stainless tubing for each 4 support is damaged from lack of cathodic protection.
5. Install new 12V panel and migrate wiring to new panel. I just don't care for the existing fused switches at the lower helm, it is a bit of a rat's nest of wiring behind the helm and I want to move most everything to a breaker panel.
6. Complete fabrication of anchor platform and install with new windlass. I started this project during my haul last year and just didn't finish. Retrieving the anchor by hand really isn't bad but I need to get this project done.
7. Repair starboard gunnel. 3 foot section of spider cracking of gelcoat inside of rub rail. A previous owner smacked a piling hard amidships, this will require substrate repair of the fiberglass and gelcoat work. Looking forward to getting this done.
8. Straighten Stanchion, the forward port stanchion was bent upon purchase, I need to straighten or replace.
9. Replace life lines, the vinyl covered life lines are rust stained, the cable is compromised and a safety hazard. The replacements won't have the coving to trap in moisture. I should have addressed this sooner.
10. Repair cockpit core, there are two distinct soft spots in the cockpit, one at the base of the latter, one behind the sliding door to the saloon (salon?).
11. Kiwi grip cockpit and flybridge deck. After repairing the cockpit, this will clean up the appearance of both areas.
12. Install autopilot. This can wait until the boat is back in the water but this is a nice to have - borderline fun project that will be a break from the repairs. I'm doing this in conjunction with adding a MFD to the lower station which can control the AP as well.
13. Replace center support bearing, I don't know if it is back or not but it is probably due, I have the new one on hand but need to have the prop pulled or to borrow a prop puller to knock this out.
14. Replace exhaust manifold?, haven't made a decision on this one yet but I don't see any records of it being done before and it is probably due.
No big deal right? Hoping to launch by end of April.