Progress on Godspeed II
She has been on the hard now for 5 weeks. We are getting the once in my lifetime bottom job done. Have rerun all the sanitation lines. Replaced all the water intake hoses, old corroded hose clamps. Scrubbed the bilge, Up grades some fixtures. Replaced a couple soffit panels previously damaged by water intrusion - repaired a couple leaky hatches. Replaced rub rail on the lower splash rails. And - starting in the bow have been repairing the teak deck - neglected maintenance stuff. Hope to be back in the water and moving in a few weeks.